Tiler at work on the bothy roof
Tiler at work on the bothy roof
Building the walls for the front of the conservatory
Building the walls for the front of the conservatory

Construction is well under way with the roof going on to the bothies and the foundation walls going in for the main conservatory. We had a first glimpse of the old boilers as they were rediscovered underneath the bothy floors. (More photos follow on Scampston conservatory blog when the boilers were examined in June http://scampston-conservatory.blogspot.co.uk/2014_07_01_archive.html)

First view of the boiler under the bothy floor
First view of the boiler under the bothy floor.
Boiler flue
Exposed boiler flue