Construction is well under way with the roof going on to the bothies and the foundation walls going in for the main conservatory. We had a first glimpse of the old boilers as they were rediscovered underneath the bothy floors. (More photos follow on Scampston conservatory blog when the boilers were examined in June http://scampston-conservatory.blogspot.co.uk/2014_07_01_archive.html)