This slideshow requires JavaScript.

Concrete floors are now in place in the conservatory. The old steps and different levels have gone and the flooring of the new conservatory will now be on one level throughout. Walls are going in and brickwork arch details are carefully being reinstated. Meanwhile water and sewage pipework and services are going into the ground around the back, feeding in behind the bothies. A first trial roof strut and window is now in place.